Odis Filtering Ltd-Won Rs.0 Rs Tender

Ponikve Voda D.O.O.

TRID : 8202137 Actual Tender Number :
AOC

Contract awarded for wastewater collection, drainage and treatment system on the island of krk - construction and upgrading of wastewater treatment plants stated in point 11 of book 1 of the procurement documentation value of the result: winner selection date : 04/05/2020 date of conclusion of the contract :08/10/2020 offizielle bezeichnung: neoplast industry d.o.o. registrierungsnummer: 105172443 postanschrift: suvoborska 7a stadt: beograd postleitzahl: 11000 land: serbien e-mail: office@neoplast.rs telefon: +381 112651688 rollen dieser organisation: , offizielle bezeichnung: art-graditeljstvo d.o.o. registrierungsnummer: 58842814429 postanschrift: vucak 28 stadt: zagreb postleitzahl: 10090 land, gliederung (nuts): grad zagreb (hr050) land: kroatien e-mail: mihaljevic8a@gmail.com telefon: +385 13499295, offizielle bezeichnung: odis filtering ltd registrierungsnummer: 511009961 postanschrift: 8 martin gehl st. stadt: petach-tikva postleitzahl: 49130 land: israel e-mail: office@neoplast.rs telefon: +972 39258500lot-0001:title: wastewater collection, drainage and treatment system on the island of krk - construction and upgrading of wastewater treatment plants lot-0001:description: the subject of the procurement is the design, obtaining permits, construction, supply and installation of equipment, commissioning, trial operation, tests upon completion (tests before and during commissioning), and the removal of hidden and all other defects within the warranty period related to the construction of 2 devices and the upgrade of 4 wastewater treatment plants (wtps) with a total capacity of 85,000 pe with sludge treatment and disposal: - upgrade of the omišalj wwtp to a second stage of purification with a capacity of approx. 7,000 pe, - upgrade of the malinska-cuf wwtp to a second stage of purification with a capacity of approx. 25,000 pe, - upgrade of the krk wwtp to a second stage of purification with a capacity of approx. 19,000 pe, - upgrade of the punat wwtp to a second stage of purification with a capacity of approx. 12,500 pe, - construction of the baška wwtp with a second stage of purification with a capacity of approx. 14,000 es, - construction of the second stage of air conditioning and purification plant with a capacity of approx. 7,500 es; - construction of a composting plant for all six composting plants at the treskavac plant - connection of newly built facilities to the scada system managed from the dispatch center the works within this contract consist of: (1) design (conceptual design – changes/supplements if necessary, main design, detailed design, as-built design), (2) obtaining approvals and permits, (3) construction of the plant and equipping the plant, (4) commissioning of the plant, (5) training of the client's staff, (6) proving the required parameters in trial operation and during tests upon completion, including the implementation of a technical inspection, (7) procurement of spare parts and equipment and (8) elimination of defects within the warranty period. detailed technical specifications are contained in book 3 of this documentation (client's requirements). .wastewater collection, drainage and treatment system on the island of krk - construction and upgrading of wastewater treatment plants

Key Values
Tender Value : Refer Document
Contract Value : Refer Document
Difference : -
Key Date
Publication Date : -
Submission Date : -
Awarded Date : Refer Document
Completion Date : 01-Mar-2025
Key Location
Location : Israel
Address :
BidderList